BOQ quantities
Every quantity read from the tender drawings, with the drawing, sheet and note it came from. Your team can check any line in minutes.
Send us the tender ID. We give you the quantities, a priced estimate at MES SSR rates and a pre-bid query letter, before the pre-bid meeting.
WhatsApp / call: +91 78304 47356
Every item calculated from the tender drawings: concrete, steel, shuttering, brickwork, plaster, finishes and more. Each one shows the drawing it came from.
The quantities priced at MES SSR Part II (2020) base rates, trade by trade, with the working for every section.
Where the drawings, Schedule of Finishes and Particular Specification do not match. Ready on your letterhead before the pre-bid meeting.
Also available: CPM chart · site layout plan · stage-wise material schedule · 3D model · a sitting with your team
Every quantity read from the tender drawings, with the drawing, sheet and note it came from. Your team can check any line in minutes.
Where the drawings, Schedule of Finishes and Particular Specification do not match, and which details are missing. Ready on your letterhead before the pre-bid meeting.
The quantities priced at MES SSR Part II (2020) base rates, with the working for every section and the drawings behind it.
We go through the quantities, the estimate and the queries together, on a call or in person.
Click any column, slab, wall or door to see its quantity and cost, or cut the building at any floor.
Every activity in order, with its duration and the critical path, so the work finishes within the contract period.
Where the site office, cement store, steel yard, mixer area, labour huts and material stacks go on your site.
Cement, steel, sand, aggregate and bricks needed at each stage (foundation, plinth, each floor, finishes), to plan buying and cash flow.
Experienced civil engineers check the full report: quantities, methods, assumptions and the query letter.
That is all we need to start. We get the tender documents and drawings. If anything is not on the portal, we will ask you.
Our system reads every drawing sheet. An engineer checks anything it is unsure of.
Quantities item by item, each with the drawing it came from. Mismatches and missing details go into the query letter.
Civil engineers check the full report. You get the query letter first, then the quantities and estimate.
There are tender services that help with estimates. Most do not give you a report you can check, do not prepare pre-bid queries, and do not price at MES SSR rates. Their quantities are usually worked out by hand under time pressure, which leaves room for errors.
| What you need | Typical tender services | Naksha Labs |
|---|---|---|
| Quantities from scanned drawings | By hand, under time pressure | ✓Machine-read, every figure traced |
| A report you can check | A total, or a BOQ sheet | ✓Working for every section, with sources |
| Pre-bid queries | Rarely offered | ✓A ready letter, before the meeting |
| MES SSR pricing | Often CPWD rates only | ✓MES SSR Part II (2020) |
| Engineering check | Varies | ✓Every report, by civil engineers |
| 3D view of the building | No | ✓Optional, with cost by element |
| CPM chart (work programme) | Usually a separate job | ✓Optional, planned from the same quantities |
| Site layout plan | Usually a separate job | ✓Optional, drawn for your site |
| Material purchase schedule | Rarely offered | ✓Optional, stage-wise from the BOQ quantities |
| A sitting with your team | Rarely offered | ✓Optional, on a call or in person |
Reading a scanned MES drawing set the way an experienced engineer does is hard. Drawings are scanned, hand-annotated and full of small print. We built our own system to do it, from the ground up, and refined it on real MES tenders.
Our own machine learning pipeline reads scanned tender drawings at full resolution: thousands of labels, dimensions and notes on every sheet.
More than 40 calculation methods, each built for one element and one quantity, capture how MES work is measured. AI applies them to your tender.
Every report goes through experienced civil engineers before it reaches you.
Every drawing is generated from the tender drawings to work out a quantity, and sits next to its calculation in the report.
An extract from a real estimate, with the tender details removed: the dashboard, basic facts, the raft and excavation with their drawings, and the SSR cost summary.
















We are starting with a few contractors bidding MES tenders. As we are just starting out, the full work for your next tender comes at a heavy discount. All we ask is your honest feedback after the bid.
Yes. Your documents, our working and your pricing stay with you. This is written into our engagement letter.
No. We take one bidder per tender, and we do not take up any tender where we have an interest of our own.
We agree the dates at the start of each tender. The pre-bid query letter reaches you before the pre-bid meeting, and the full work before the bid date. Send the tender early to get the most from it.
Just the tender ID to start, and one person we can call with questions. We get the tender documents and drawings; if anything is not on the portal, we will ask you for it.
No. We price at MES SSR base rates so you have a clear base. Your rates, margin and final bid remain your decision.
No. The fee is fixed and agreed before we start, whether you win or lose.
Send the tender ID or the drawings. We will reply with the scope and the dates.